This sounds like a bug because it works differently than NJT 7 so I wanted to verify.
Let's say I download some market replay data for 5/16/2017.
After connecting to Playback, I go to the Playback control and change the Start to 5/15/2017 and End to 5/16/2017.
The Playback control at Top says 5/15/2017 11:00 PM.
I right click and choose 'Go To' and then specify 5/16/2017 7:30AM and hit OK.
The Playback controller then greys out and immediately goes to 5/16/2017 7:30AM but then immediately reverts back to 5/15/2017 11:00 PM and then slowly moves 5 minutes at a time until it reaches 5/16/2017 7:30AM. The controls are then enabled once 7:30AM is reached.
What is going on here?
Comment