Change date of Start forward.
Strategies from "previous playback run".
Select all strategies, and right click to enable. As you can see in the image it is greyed out.
(Before selecting the Start Date change, it was available).
The image was after I enabled the 3rd strategy individually, and then selected the top 2, and was no able to.
more playing:
Interesting, I changed the start date again (to 8/31/2015, within the contract requirement) - and I can now enable them again. Yup, changed date to 4/13/2015 (random outside), and I can no longer enable them. Hit play and cannot enable them. Not sure if this is by design. Should be able to enable anything at anytime,no?
Comment