A couple of questions of loading historical data at run time:
This is on single instrument, multiple timeframes (let's assume primary is 30m, and 2nd is 180m).
1. Is it possible to, at runtime, to change the '# of days' loaded in a chart?
2. Is it possible to load say 360 days for the 180m, and only 60 days for 30m?
Thanks.
Comment