Is it possible to define a "Days to Load" fix setting for a chart when switching between daily and minute chart?
For a daily chart I am loading 365 days, 60 min I need 90 days, 10 / 5 min I use 30 days.
Switching back and forth forces me always to override the default "Days to load" from 5 to my desired 90 or 30 days.
Is there a workaround or a trick to define fix setting for "Days to load"??
Thanks.
Comment