I need to access the From Date when doing a backtest. Ideally this could be accessed from the Initialize or OnStartup methods, as I need this information to load historical parameters from a database before the strategy turn on.
I guess this information is contained in StrategyBase? How can I access this, apart from creating a seperate (and superfluous) input in my own strategy?
Thanks
Comment