I am on Ninja 6.5. Can you please tell me if there is anyway to save/copy all the draw objects on one chart to another chart in the same workspace. Something like replicating the chart, without recreating the draw objects on the 2nd chart manually.
For example, if someone marks like S/R levels and draw objects on one bigger time frame chart. And then wants to mark the same S/R levels and draw objects on the 2nd chart (whose time frame can later be reduced to a lower time frame).
Thanks
RK
Comment