I made the following changes:
- entered the single side commission cost amount to the Rithmic section of the
"Commissions" tab of the "Options" box.
- Checked the "Apply commission to PnL calculations" option in the "General" tab.
In Control Center it shows P/L as $100 (example) but DOM shows as $200 since commissions not included.
How to fix it?
Comment