I'm using the 'playback connection' utility in NT8.
When I'm operating one day, I draw lines and rectangles with templates on the graph and I also use the volume indicator, drawing a line at a certain volume level.
However, when I go to operate the next day, everything I draw the day before has been lost.
Is it possible to keep what I drew the day before when operating the next day in 'playback connection'?
Comment