When using the Strategy analyser the time frame could be set for 1/6/2018 to 30/06/2018 and the results when run would be 07/05/2018 to 06/06/2018. this isnt what I set for the period to run?
I have tried this several times ? why doesnt the test run for the period set for it?
Thanks
Comment