I've been trying to add a 1 second time chart as an additional panel to my primary 2000 tick chart. When I do so, the tick chart becomes extremely distorted and spaced out as it seems it's running in line with the 1 second chart panel, and the tick chart becomes unreadable. Is there a way I can add the 1 second chart panel without altering the scaling/"speed" of the tick chart? My end goal is to have the primary tick chart move based on ticks, and a lower panel 1 second chart move at the appropriate speed of 1 bar per second.
Thanks!
Comment