Is it possible to programmatically adjust the start/end date of an optimization being run from the Strategy Analyzer?
I have extended the base DefaultOptimizer code and can easily reference the OptimizationParameters array so I assumed that the start/end date should be similarly referenceable.
Thx
Comment