For example,
Optimize from 01/17 to 06/17 (i.e. 6 months), then apply optimized result to month 07/17.
Then,
Optimize from 02/17 to 07/17 (i.e. 6 months), then apply optimized result to month 08/17.
Is this possible to do without having to do it manually?
Comment