I'm developing an application for NT8 and I need to somehow "hook" onto walk forward process. Specifically I need to make some calculations with walk forward test period results. This is a normal backtest (with parameters calculated in the optimization period) and I would need to find a method being called on every test period of the walk forward optimization.
Thanks.
Comment