I need to implement 2 vertical lines to determine the start date and the end of the data sample. In what methods should I revise them, and how can I then contact them to get the data of the time. Which method should work when dragging lines and releasing the mouse button to redraw the indicator. If there are examples or links I will be grateful.
Thank you.
Comment